In the case of the repair of the Solotchinsky Bridge over the Oka River in Ryazan, an additional examination will be carried out. The corresponding decision of the regional arbitration court was published in the state electronic library.
An employee of the St. Petersburg State University of Architecture and Civil Engineering will have to assess the volume, cost and quality of the work already completed. He also has to find out for what reasons there may be shortcomings on the bridge and what measures must be taken in this case, specifies 62INFO.ru.
According to the site, a Moscow company had previously carried out an examination on the same issues. The plaintiff company, which repaired the bridge, asked to exclude her conclusion and appoint a re-examination, but the court refused. At the same time, the court ordered an additional examination.
According to 62INFO.ru, Alliance Group of Companies demands from the State Directorate of Roads of the Ryazan Region 24 million rubles as payment of debts and penalties. The Directorate filed a counterclaim to eliminate the deficiencies in the bridge repair.
In parallel with this, the court is considering the claim of the Ministry of Transport of the region against Alliance, according to which it requires 29 million rubles from the company as compensation for losses.
The Solotchinsky Bridge was repaired in 2018. After that, motorists began to complain about the road surface.