The Ryazan administration announced a list of roads on which defects were detected during the warranty period. Information was published by 62ИHФO.
The mayor’s office said that during the survey, deficiencies were found on 43 sections of the guarantee roads:
- st. Biryuzova;
- st. Large;
- Vasilievsky passage;
- st. Spring (stage 1);
- st. Cherry;
- st. Vokzalnaya;
- Eastern ring road;
- st. Golenchinskaya;
- st. Griboyedov;
- Dimitrov square;
- st. Prince Field;
- st. Koltsov;
- st. Kostycheva;
- st. Krasnoryadskaya;
- Kuibyshevskoe highway;
- st. Liebknecht;
- st. Moscow;
- st. Mervinskaya;
- 7th Mervinsky passage;
- st. Novoselkovskaya;
- st. Ostrovsky;
- Pervomaisky prospect;
- st. Pity;
- st. Field;
- st. Radishchev;
- st. Razin;
- Rechnikov’s passage;
- Ryazhskoe highway;
- st. Connections;
- Serezhin lane;
- st. Sokolovskaya;
- Old Believer passage;
- North lane;
- st. Uritsky;
- st. Timakova;
- st. Labor;
- st. Firsova;
- Khirinsky passage;
- st. Chkalov;
- South Lane;
- st. Yunnatov;
- Yablochkov’s passage.
We will remind, the governor Nikolay Lyubimov instructed to get contractors to eliminate defects under warranty.